12
INSTALLING THE COOKER HOOD
Please ensure that when the appliance is installed
it is easily accessible to an engineer in the event of
a breakdown.
All installations must comply with the local
authorities requirements for the discharge of
exhaust air.
Incorrect installation may affect the safety of this
cooker hood.
Installation Requirements
Before installation check the wall to which the
cooker hood is to be tted for electric cables,
water pipes or gas.
This cooker hood is designed to be xed to any vertical
surface over a cooking area, and can be used in the
extraction (ducted to the outside) or recirculation mode.
The installation work must be undertaken by a qualied
and competent person.
The manufacturer disclaims any responsibility for
damage due to incorrect installation of the cooker hood
or if the hood is not installed in compliance with relevant
regulations controlling this type of installation.
Unpacking
Before unpacking the cooker hood position
the carton with the arrows pointing upwards as
illustrated on the carton.
The cooker hood is made up of the following
components:
Ref Qty Product Components
1 1 Hood body, complete with controls,
lighting, fan and lters.
2 1 Telescopic Chimney comprising:
2.1 1 Upper section
2.2 1 Lower section
3 2 Extensions metal
9 1 ø150-120 Ducting spigot
10 1 Dumper ø150
14.1 2 Air outlet Connection Extension
15 1 Air outlet connector
Ref Qty Installation Components
7.2.1 2 Upper chimney Section Fixing
Brackets
7.3 1 Air Outlet Connection Support
12a 4 Screws for extencion
12c 6 Screws 4,9 x 9,5
Ref Qty Documentation
1 Instruction booklet
�
Comments to this Manuals