SPLIT - TYPEP/No.:[ADD APPLICABLE BRAND HERE]
95. Piping and wrappingBundle the tubing, connecting cable, anddrain hose with tape securely and evenly as shown in Fig.11. Because the condensed
REFRIGERANT PIPE CONNECTIONSecuring of outdoor unitAnchor the outdoor unit with a bolt and nut 10 or 8 tightly and horizontally on a concrete or r
BarCopper pipeClamp handleRed arrow markConeYokeHandleBar"A"C: Putting flare nut on Remove flare nuts attached to indoor and outdoo
Smooth all round Improper flaringEven lengthall roundTubing retainerRear leftFrontRear rightDrain hosePipingConnecting cableCheck For Rear Right Pipin
Insert the piping, drain hose and the connecting cable into the piping hole.Tubing retainerConnectingcable:::::REFRIGERANT PIPE CONNECTION 13
Tubing retainer 14For Rear Left Piping::::REFRIGERANT PIPE CONNECTION
::::REFRIGERANT PIPE CONNECTION 15
Connection of pipes - outdoorTubing retainerConnectingcable:::::7.58REFRIGERANT PIPE CONNECTION 16.
17ELECTRICAL WORKTerminal block of indoor unit7000Btu/h model12000Btu/h modelall models according to diagramTo outdoor unitCord clampL N S 1
LS NWire connector of outdoor unitWire -holding board40mm10mmConnect the cable to the outdoor unit::::ELECTRICAL WORK7 18
1CONTENTS Contact an authorised service technician for repair or maintenance of this unit. Contact an authorised installer for installation of th
Checking the drainageCHECKING THE DRAINAGE AND FORMING THE PIPINGDownwardslopeWaterleakageWaterleakageWaterleakageAirDo not raiseAccumulateddrain wate
Air and moisture in the refrigerant system have undesirable effects as indicated below: Pressure in the system rises. Operating current rises. Cooling
Open the valve stem until it hits against the stopper. Do not try to open it further.Securely tighten the valve stem cap with a spanner or the like.Va
Perform the electric safe check after completing installation:1. Grounding work After finishing grounding work, measure the grounding resistance b
23 TEST RUNNING
! 2SAFETY PRECAUTIONSOPERATING TEMPERATURE 433024-5543024-7T3
65mm or 95mm)Clip AnchorSeal (See page 10 for details)16.0mm 3Cable Tie (5~10)Insulation materialsBEFORE INSTALLATIONTools needed for instal
Connecting pipe AssemblyInstallation PlateSelf-tapping Screw A Clip AnchorLoop theconnectivecable.CBA60cm above60cm above10cm above100cm above612cm
225INSTALLATIONRead completely then follow step by step.Indoor unitOutdoor unitRooftop installatiomInstallation Fig.1Fig.2
Capacity is based on standard length and maximum allowance length is on the basis of reliability. Oil trap should be installed every 5~7 metres.When t
72. Drill a hole in the wall 1. Determine hole positions according to the diagram detailed in Fig.5. Drill one (1) hole ( 65mm <998*322 or
81. For the left-hand and right-hand piping, remove the pipe cover from the side panel. 2. For the rear-right-hand and rear-left-hand piping,
Comments to this Manuals